Technical specifications

Scope of works:

  • Twin-tube road tunnel under the River Thames, 2 x 1,400 m long,
  • internal diameter 10.66 m, external diameter 11.45 m
  • Access ramps, 600 m in length
  • 8 cross-passages
  • Service buildings at both tunnel portals
  • 1 new footbridge
  • 1 new overbridge for the southbound carriageway of the Blackwall Tunnel

Construction method:

  • TBM tunnelling using an EPB TBM, 2 x 1,120 m
  • TBM diameter 11.8 m,
  • Twith steel fibre reinforced segmental lining,
  • Construction of cross-passages using ground freezing and sprayed concrete lining including rebar reinforded concrete secondary lining, 300 m cut and cover tunnel

Geology

  • London Clay, dense sands of the Lambeth Group, dense gravels of the Harwich Formation, River Terrace Deposits

General data

Project
Silvertown Tunnel, London, United Kingdom

Client

Transport for London (TfL), London, United Kingdom

Contractor

Wayss & Freytag Ingenieurbau AG in a Joint Venture

Construction period

2019 to 2025

Construction costs
GBP 945 million

Utilisation
WInfrastructure
Type
Road tunnel
Length
2,800 m
Construction Method
Tunnelling using an EPB TBM
Related Projects

Related Projects

Fehmarnbelt Tunnel Denmark
Fehmarnbelt Tunnel Denmark
Germany

Fehmarnbelt Tunnel Denmark

Read more
Storage sewer Mauerpark  Berlin
Storage sewer Mauerpark Berlin
Germany

Storage sewer at Berlin's Mauerpark will prevent sewer overflow into the Spree and Pranke rivers in the future.

Read more